Salmon Construction Ltd

ABOUT SCL RESIDENTIAL

SCL’s residential team have built a reputation for carrying out works to the highest standard from design through to completion. With extensive knowledge in this sector of works our team will be able to provide you with advise and guidance on your requirements.

From remodelling of your existing home or adding that much needed extra space from a single or double extension to loft conversions.

OUR LATEST PROJECTS

BURY ROAD

BURY ROAD

Epping
2 Story Extension
MORE

KELVEDON

KELVEDON

Grade 2 Listed Cottages
Complete Refurbishment
MORE

THEYDON GROVE

THEYDON GROVE

Remodelling to Existing Ground Floor.
MORE

EPPING

EPPING

1850s cottage Dormer loft conversion and remodelling.
MORE

BURY ROAD

Epping

Two storey extension with extensive remodelling to the existing property.

Including new kitchen, downstairs WC with bespoke concrete sink, master bedroom and ensuite.

External works including patio, retaining wall, steps and scene lighting.

Bury19
Bury18
Bury17
Bury16
Bury15
Bury14
Bury13
Bury12
Bury11
Bury10
Bury9
Bury8
Bury7
Bury6
Bury5
bury4
bury3
bury2
bury1

KELVEDON

Essex

Three grade 2 listed cottages, complete refurbishment under the guidance of English Heritage.

Including the addition of two extensions to the rear to bring back to a habitable condition.

Works are being carried out using old construction methods to keep the character and heritage of the buildings including lime plastering and oak timber replacement.

Works due for completion November 2020

Kelvedon8
Kelvedon7
Kelvedon6
Kelvedon5
Kelvedon4
Kelvedon3
Kelvedon2
Kelevedon1

THEYDON GROVE

Epping

Remodelling to the existing ground floor.

Including relocation and installation of bespoke kitchen, sun room

and revised lounge layout including installation of French doors to rear.

theydon8
theydon7
theydon6
theydon5
theydon4
theydon3
theydon2
theydon1

EPPING

Essex

1850s cottage Dormer loft conversion and remodelling of structure.

Modernisation of an 1850s cottage under constraints of existing building including the reduction

of ceiling height to 1st floor to accommodate loft room.

Relocation of bathroom from ground to 1st floor, and extended kitchen diner.

epping4
epping3
epping2
epping1